Skip to main content

RKA Industrial Solutions

Overhead Crane Engineering Services Sydney

The right assessments can mean the difference between smooth operations and costly shutdowns. RKA delivers specialised crane engineering — from structural assessments to runway capacity checks — keeping your lifting systems safe, compliant and ready for today’s demands and tomorrow’s challenges.

All assessments to AS 2550.1 and AS 1418, with clear documented reports.

Double girder overhead crane engineered and assessed by RKA in Sydney

Our crane engineering services

Structural assessments

Wear, corrosion, fatigue and damage checks against design and compliance requirements.

DWP calculations

The remaining Design Working Period of your crane, so you can plan before failures happen.

End-of-life assessments

Documented reports with recommendations for refurbishment, replacement or de-rating.

10-yearly mechanical assessments

Comprehensive assessments required under Australian Standards — every critical component checked, tested and certified.

Runway surveys & capacity checks

Alignment, structural integrity and wear surveys — plus verification for increased loads and any strengthening needed.

Design modifications

Modifications to existing structures to safely support new cranes, higher capacities or changed layouts.

Why engineering assessments matter

Crane component on the RKA workshop bench during an engineering assessment
  • Safety — prevent structural failures and reduce accident risk
  • Compliance — meet AS 2550.1, AS 1418 and other regulatory requirements
  • Planning — budget and schedule replacements or upgrades well before breakdowns
  • Performance — cranes and runways operating at optimal capacity

Findings feed straight into action: our repairs and upgrades team can carry out the recommended work, and scheduled servicing keeps everything compliant afterwards.

Frequently asked questions

Q: What is a Design Working Period (DWP) calculation?

Every crane has a finite design life based on how hard it works. A DWP calculation tells you how much of that life remains, so you can plan repairs, upgrades or replacement before a major failure — instead of after one.

Australian Standards require a comprehensive mechanical assessment as cranes reach service milestones — typically every 10 years. Every critical component is checked, tested and certified. If you’re not sure when yours is due, we can check your records and schedule it.

That’s exactly what our capacity checks answer. We verify whether your existing runway can safely take the additional capacity, and recommend any strengthening measures needed — including design modifications to existing structures.

Clear, documented reports: findings, calculations, compliance status against AS 2550.1 and AS 1418, and practical recommendations — whether that’s refurbishment, strengthening, de-rating or replacement.

Not necessarily. Our end-of-life assessments give you a documented, honest picture: sometimes refurbishment or de-rating safely extends a crane’s life, sometimes replacement is the right call. Either way you decide with data, not guesswork.

Get engineering answers

Structural questions, capacity questions, end-of-life questions — get documented answers you can plan around. Request crane support online or call 0483 985 169.

Request for Quote Form